by MVPSPORTS » Tue Apr 11, 2006 4:36 pm
I called the chick, and she basically told me that nobody gets that package, and most of that stuff is thrown in anyway... Guess it's sort of a retard-detector ("Oh, I guess I need a fusebox, right...")...
The options I'm getting now are the prewiring for speakers, fans, and recessed lighting since I can't do it myself (or at least they say so... I did it in my house, but I didn't have a 3story house... I just used my attic crawlspace, which this won't have)....
I'm gonna get the laminate countertops in the kitchen and bathrooms, as I dont think they're givin me a very good deal for an upgrade, and I can always change that out whenever I want...
Deciding between having wood floors put in, or doing it myself, as I did it here... It's kind of a pain in the balls, so it'll depend how much it costs...
Seb... these are preconstruction houses... It'll be built in October, so I can basically put whatever I want in it...
Anyone lived in a 2story house, that knows the functionality/niceness of a "pony wall"...??? I don't really feel like shellin out 5k for that oak rail, especially cause I HATE oak and would have to stain it...